RTU, data logger, gateway or IoT controller

Four kinds of device get specified for a remote site, and the names overlap. They differ in where the data ends up and who it is for. Picking the wrong one is how a project ends up with a gateway and nothing to send the data to, or a SCADA outstation on a point nobody polls.

What each one does

DoesData goes toFits
RTUOutstation for a SCADA system, answering a master over a SCADA protocolThe SCADA masterUtilities with a SCADA system already running
Data loggerRecords readings locally, sometimes with a modemA file or the maker's softwareSurveys and studies where the record matters more than alerts
Protocol gatewayConverts one protocol to another, for example Modbus to a network protocolWhatever system you point it atIntegrators who already have the platform
Cellular IoT controllerReads sensors, holds the record, alerts, and can switch outputsA cloud with alerts, export and an APIDistributed points with no network and no platform yet

How to choose

There is a SCADA master already

Then the outstation has to speak its protocol. That is an RTU job.

You already run a platform

Then a gateway that delivers raw values may be all you need, and the platform does the rest.

There is no system yet

Then the box has to bring one: the record, the alerts and the access. That is what a cellular IoT controller with its own cloud does.

Where Genesis sits

Genesis is the fourth kind: it reads the sensors, keeps the record through outages, alerts people and switches outputs, with a cloud and a REST API included.

It is not a SCADA RTU and not a transparent gateway. If the site needs either of those, it needs a different box.

Related

Frequently asked questions

Can Genesis act as a Modbus gateway to our own master?

No. It reads defined values from supported sensors and delivers them through its cloud and API. A transparent Modbus bridge is a different product.

Can its data reach our SCADA?

Through the REST API, a SCADA or historian that can pull from an HTTP API can collect the readings.

Not sure which one the site needs?

Tell us what has to be measured or switched, where, and what it has to report into. We say which approach fits, including when it is not ours.

Talk to us →